Elite Highways was commissioned Cummings International in Darlington to excavate a new inspection pit within their factory. The pit was required to accommodate a new piece of machinery that was being installed in the factory.
The excavation work was carried out in a confined space with difficult access and egress. Elite Highways used a variety of techniques to safely excavate the pit, including:
Using small excavators that were able to maneuver in the confined space.
Installing temporary supports to prevent the sides of the pit from collapsing.
Using a variety of safety measures to protect workers from injury.
The excavation work was completed on time and within budget. The pit was excavated to a high specification and was able to accommodate the new machinery.
Here are some additional challenges that Elite Highways faced during this project:
The confined space made it difficult to bring in large equipment and materials.
The difficult access and egress made it difficult to get workers in and out of the pit.
The safety risks associated with working in a confined space.
Despite these challenges, Elite Highways was able to successfully complete the project. The company’s experience and expertise in confined space working allowed them to safely and efficiently excavate the new inspection pit.
Here are some additional benefits of the project:
The new inspection pit will allow the manufacturing company to more easily inspect and maintain their machinery.
The new inspection pit will help to improve safety in the factory by providing a safe and secure place to work on machinery.
The project has created jobs and boosted the local economy.
Overall, the excavation of the new inspection pit was a success. It has improved the efficiency and safety of the manufacturing company’s operations.